Business Administration and Management

  • Home
  • About
    • About the Journal
    • Contact
  • Article
    • Current
    • Archives
  • Submissions
  • Editorial Team
  • Announcements
Register Login

ISSN

2661-4014(Online)

Article Processing Charges (APCs)

US$800

Publication Frequency

Quarterly

PDF

Published

2024-12-31

Issue

Vol 6 No 4 (2024): Published

Section

Articles

International engineering English translation: A case study in FIDIC terms and practice

Yuanfu Shen

The Hang Seng University of HongKong


DOI: https://doi.org/10.59429/bam.v6i4.8360


Keywords: Case study; Language Characteristics; Discussion


Abstract

With more and more Chinese companies being involved in global business, shortage of professional technical English translators become an issue as some cases showed that this has become a barrier in daily business. I took FIDIC contract template as case study to show the importance of knowing the prevailing international practice, in-depth understanding of specific technical area and local culture and language habit in translation. I also found some interesting phenomenon of translation method evolution which are deserved for further investigation.


References

[1] Goetz, C. J., & Scott, R. E. (1977). Liquidated Damages, Penalties and the Just Compensation Principle: Some Notes on an Enforcement Model and a Theory of Efficient Breach. Columbia Law Review, 77(4), 554–594.

[2] J. B. W. (1916). Damages: Liquidated Damages or Penalty. California Law Review, 5(1), 75–77.

[3] Kaufman, B. E., & Dunlop, J. (2002). Reflections on Six Decades in Industrial Relations: An Interview with John Dunlop. ILR Review, 55(2), 324–348.

[4] Damages. Liquidated Damages. Clause Relating to Delay Held Applicable Where Contractor Abandons Work. (1938). Harvard Law Review, 52(1), 160–161.

[5] McCormick, C. T. (1930). Liquidated Damages. Virginia Law Review, 17(2), 103–128.

[6] Brightman, A. C. (1925). Liquidated Damages. Columbia Law Review, 25(3), 277–304.

[7] J. F. H. (1915). Damages. Penalty or Liquidated Damages. University of Pennsylvania Law Review and American Law Register, 63(3), 220–223.

[8] Liquidated Damages and Penalties. (1915). Virginia Law Review, 2(4), 290–292.

[9] Singh, K. (1961). Penalty or Liquidated Damages. University of Malaya Law Review, 3(2), 287–289.

[10] Talley, E. L. (1994). Contract Renegotiation, Mechanism Design, and the Liquidated Damages Rule. Stanford Law Review, 46(5), 1195–1243.

[11] Goetz, C. J., & Scott, R. E. (1977). Liquidated Damages, Penalties and the Just Compensation Principle: Some Notes on an Enforcement Model and a Theory of Efficient Breach. Columbia Law Review, 77(4), 554–594.

[12] Tyler, S. M. (1994). No (Easy) Way out: “Liquidating” Stipulated Damages for Contractor Delay in Public Construction Contracts. Duke Law Journal, 44(2), 357–435.

[13] Tyler, S. M. (1994). No (Easy) Way out: “Liquidating” Stipulated Damages for Contractor Delay in Public Construction Contracts. Duke Law Journal, 44(2), 357–435.

[14] Pearce, D., & Halson, R. (2008). Damages for Breach of Contract: Compensation, Restitution and Vindication. Oxford Journal of Legal Studies, 28(1), 73–98



ISSN: 2661-4014
21 Woodlands Close #02-10 Primz Bizhub Singapore 737854

Email:editorial_office@as-pub.com